360 gearbox mounts,
these are very high on the to do list and I should have sorted soon.
Adjustable Torque arm,
These are very close to being ready and should be available in a couple of weeks. I will have 2 options on these with a built up bolt in job and a DIY weld in kit. I already have PU bushes available
Uprated manual 340 propshaft,
I am best part of the way there with this one but I still have a couple of issues to sort. I hope to have something done and ready soon on these
Anti roll bars,
When I have enough orders there will be another run on the 25mm front bars. I also have a working 340 rear bar but need to test this on a 360. If it fits the 360 it will be ready to go or if not I will alter the design to work on both. I will just need enough orders for them. I will start a thread just for this subject
340 bellhousing bearing,
The bearing is not a problem but the rubber casing is. This project needs some thinking about and work doing as there are more and more of these bearings failing.
Wishbone angle correction,
with lowering a 300 series the angle of the bottom wishbone changes from flat to pointing up at the outside. When comresed on cornering the camber goes positive rather than desirable negative. The kit will correct the angle of the lower wishbone for improved cornering. This project is near to being ready but will need some testing before going on sale
Door rubbers and window rubbers,
this is going to be a big project and more likely one for RJ but something does need doing.
bolt in 5 link kit,
There looks to be a demand for a bolt in 5 link kit that will do just that. I've done some drawings but that is about as far as this project has gone. When I have some of the other projects out of the way I will get back to this one so will be later this year.
B14 SU conversion kit,
I have done some work on this as I prefer the SU as a carb as it is nice and easy to tune. Manifold is ready but I still need to sort linkages
As always I would like to hear suggestions for things that are needed
these are very high on the to do list and I should have sorted soon.
Adjustable Torque arm,
These are very close to being ready and should be available in a couple of weeks. I will have 2 options on these with a built up bolt in job and a DIY weld in kit. I already have PU bushes available
Uprated manual 340 propshaft,
I am best part of the way there with this one but I still have a couple of issues to sort. I hope to have something done and ready soon on these
Anti roll bars,
When I have enough orders there will be another run on the 25mm front bars. I also have a working 340 rear bar but need to test this on a 360. If it fits the 360 it will be ready to go or if not I will alter the design to work on both. I will just need enough orders for them. I will start a thread just for this subject
340 bellhousing bearing,
The bearing is not a problem but the rubber casing is. This project needs some thinking about and work doing as there are more and more of these bearings failing.
Wishbone angle correction,
with lowering a 300 series the angle of the bottom wishbone changes from flat to pointing up at the outside. When comresed on cornering the camber goes positive rather than desirable negative. The kit will correct the angle of the lower wishbone for improved cornering. This project is near to being ready but will need some testing before going on sale
Door rubbers and window rubbers,
this is going to be a big project and more likely one for RJ but something does need doing.
bolt in 5 link kit,
There looks to be a demand for a bolt in 5 link kit that will do just that. I've done some drawings but that is about as far as this project has gone. When I have some of the other projects out of the way I will get back to this one so will be later this year.
B14 SU conversion kit,
I have done some work on this as I prefer the SU as a carb as it is nice and easy to tune. Manifold is ready but I still need to sort linkages
As always I would like to hear suggestions for things that are needed